Utility design
Water, sewer, storm, duct bank, and franchise relocations. Plans, profiles, details, and conflict tables an owner or city can review. Built for roadway, site, and campus work where the utilities are the critical path.
From $4,500Houston · Design first
AVA Engineering is a design practice. We draw the utilities, the campus, and the gas — including fuel gas for data centers — then seal the set. Coordination and field support follow the drawings. They do not replace them.
Four design lines. Everything else on this site supports these drawings.
Water, sewer, storm, duct bank, and franchise relocations. Plans, profiles, details, and conflict tables an owner or city can review. Built for roadway, site, and campus work where the utilities are the critical path.
From $4,500Site civil, yard layout, cooling-plant pads, primary electrical service alignment, and utility corridors for a hall or a campus. We design the bones the building sits on — not the server rows.
From $18,000Fuel-gas laterals, meter-set layouts, generator headers, and campus distribution to backup generation. Sized for the load, coordinated with the electric service, and drawn so the gas company can review it.
From $8,500Distribution mains, service laterals, regulator stations, and commercial or industrial feeds outside a data center. Alignment, class location notes, details, and permit drawings for the operator or the city.
From $6,500Support that stays tied to the design. Not a construction-management menu.
Independent check of another firm’s utility or gas set, then a seal when it meets the standard.
Relocation alignments and details where a roadway or campus hits existing lines.
Station piping, pads, and clearances for gas company review.
Power and fiber corridors into a data hall or substation yard.
City, county, and operator packages with notes, details, and calculations.
Redlines turned into a clean as-built of the designed utilities.
Standard design scopes. Incomplete surveys, extra sheets, and rush work are quoted after we see the files.
| Design | Standard scope | Starting fee | Time |
|---|---|---|---|
| Utility design | Site utilities or short relocation | $4,500 | 2–4 weeks |
| Data center design | Yard, service path, utility corridor | $18,000 | 4–8 weeks |
| Gas for data centers | Fuel gas to generators, meter set | $8,500 | 3–6 weeks |
| Gas design | Main, lateral, or commercial feed | $6,500 | 3–5 weeks |
| Design review / seal | Drawings and calculations | $1,400 | 1–2 weeks |
Starting fees for a defined Texas design package. Survey, geotech, extra agencies, and resubmittals after the included revision may be extra. A written proposal is issued before work starts.
Files in. Scope in writing. Drawings out.
Survey, loads, address, owner, and deadline.
Fee, sheets, and delivery date before we draw.
Plans, profiles, details, and calculations.
Review set, then a sealed package for the agency.
AVA Engineering
Houston. Send the site, the load, and the deadline. Both addresses get the request.
m.alani@ava-architects.krd
salah.khafaji@ava-architects.krd
Houston, Texas